What are the requirements for the hospital generator 3-year load test?

Emergency power generators shall be tested once every 36 months for a minimum of 4 continuous hours at a connected load of at least 30% nameplate rating or operated to meet the manufacturers’ recommended prime mover’s exhaust gas temperature.

Share:
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments