Novant Health | Compliance Documentation 201
Novant Health | Compliance Documentation 201
Assessment Summary
0 of 11 Questions completed
Questions:
Information
You have already completed the assessment before. Hence you can not start it again.
Assessment is loading…
You must sign in or sign up to start the assessment.
You must first complete the following:
Results
Results
0 of 11 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Novant Health | Compliance Documentation 201 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 11
1. Question
Which of the following entities is responsible for conducting preventive maintenance on most fire suppression systems at Novant Health facilities?
CorrectIncorrect -
Question 2 of 11
2. Question
Which of the following documentation intervals is required for an airborne isolation room when occupied by a patient?
CorrectIncorrect -
Question 3 of 11
3. Question
Which of the following critical documents is commonly presented to and reviewed by a surveyor?
CorrectIncorrect -
Question 4 of 11
4. Question
Which of the following procedures is required for supplemental annual load bank testing if the monthly 30-minute load requirement isn’t met on the diesel generators?
CorrectIncorrect -
Question 5 of 11
5. Question
What is the requirement of the person performing maintenance on fire extinguishers?
CorrectIncorrect -
Question 6 of 11
6. Question
Which of the following Joint Commission Standards reference code-required written documentation for equipment, testing, inspection, and maintenance?
Which of the following DNV Standards reference code-required written documentation for equipment, testing, inspection, and maintenance?
CorrectIncorrect -
Question 7 of 11
7. Question
The Joint Commission requires certain tasks or functions to be completed on a quarterly basis. Which of the following timeframes is permissible for quarterly tasks?
CorrectIncorrect -
Question 8 of 11
8. Question
The Joint Commission requires certain tasks or functions to be completed on a semi-annual basis. Which of the following timeframes is permissible for semi-annual tasks?
CorrectIncorrect -
Question 9 of 11
9. Question
What is the testing frequency requirement for sprinkler low air pressure switches?
CorrectIncorrect -
Question 10 of 11
10. Question
Emergency generators require 4-hour load bank tests at which of the following frequencies?
CorrectIncorrect -
Question 11 of 11
11. Question
The Joint Commission requires certain tasks or functions to be completed on an annual basis. Which of the following timeframes is permissible for annual tasks?
DNV requires certain tasks or functions to be completed on an annual basis. Which of the following timeframes is permissible for annual tasks?
CorrectIncorrect
