Novant Health | Interim Life Safety Measures 401 (RETIRED 09.25.22)
Novant Health | Interim Life Safety Measures 401 (RETIRED 09.25.22)
Assessment Summary
0 of 8 Questions completed
Questions:
Information
You have already completed the assessment before. Hence you can not start it again.
Assessment is loading…
You must sign in or sign up to start the assessment.
You must first complete the following:
Results
Results
0 of 8 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Novant Health | Interim Life Safety Measures 401 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 8
1. Question
Which life safety deficiency requires a fire watch as part of ILSM/ALSM implementation?
CorrectIncorrect -
Question 2 of 8
2. Question
A facility manager completes an ILSM Risk Assessment for a renovation project. Later, they discover a deficiency that was not originally documented during the initial assessment process. Consequently, a Novant Health committee will determine the mitigation plan to address the newly discovered deficiency. Per the Novant Health ILSM Policy, which of the following representatives shall be included in this committee?
A facility manager completes an ALSM Risk Assessment for a renovation project. Later, they discover a deficiency that was not originally documented during the initial assessment process. Consequently, a New Hanover committee will determine the mitigation plan to address the newly discovered deficiency. Per the New Hanover ALSM Policy, which of the following representatives shall be included in this committee?
CorrectIncorrect -
Question 3 of 8
3. Question
Which of the following Joint Commission elements of performance is related to educating staff who occupy areas where fire/smoke barriers are compromised and where they will need to evacuate to in the event of a fire?
CorrectIncorrect -
Question 4 of 8
4. Question
When the hospital identifies Life Safety Code deficiencies that cannot be immediately corrected and a fire watch is initiated, which NFPA codes will provide the correct actions to be taken?
CorrectIncorrect -
Question 5 of 8
5. Question
A pre-construction risk assessment is conducted at the beginning of a new construction project. Of the following options, what information is verified during the assessment process?
CorrectIncorrect -
Question 6 of 8
6. Question
What information would most likely be verified during the ILSM/ALSM risk assessment process?
CorrectIncorrect -
Question 7 of 8
7. Question
From which Novant Health ILSM Policy Appendix does the following statement originate?
Educate staff occupying area that fire/smoke barriers are compromised and where they will need to evacuate to in the event of a fire.
In which New Hanover ALSM Policy Appendix should staff training information be included?
CorrectIncorrect -
Question 8 of 8
8. Question
At what frequency should fire watch rounds be completed while they’re in place at a Novant Health facility?
At what frequency should fire watch rounds be completed while they’re in place at a New Hanover facility?
CorrectIncorrect
