Children’s Health | Building Modifications 201
Children’s Health | Building Modifications 201
Assessment Summary
0 of 8 Questions completed
Questions:
Information
You have already completed the assessment before. Hence you can not start it again.
Assessment is loading…
You must sign in or sign up to start the assessment.
You must first complete the following:
Results
Results
0 of 8 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Children's Health | Building Modifications 201 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 8
1. Question
Within healthcare facilities, what is the principle guideline of reference for HVAC systems?
CorrectIncorrect -
Question 2 of 8
2. Question
In addition to ventilation and pressurization mitigation strategies, what additional controls must be assessed when completing an Infection Control Risk Assessment (ICRA 2.0)?
CorrectIncorrect -
Question 3 of 8
3. Question
When reviewing construction drawings, where can you find the information needed to determine which doors are fire rated?
CorrectIncorrect -
Question 4 of 8
4. Question
Within a 24-hour period, how long can the sprinkler system be impaired before you are required to initiate notification and fire watch?
CorrectIncorrect -
Question 5 of 8
5. Question
Within a 24-hour period, how long can the fire alarm system be impaired before you are required to initiate notification and fire watch?
CorrectIncorrect -
Question 6 of 8
6. Question
What is the primary difference between intumescent firestop sealant and elastomeric firestop sealant?
CorrectIncorrect -
Question 7 of 8
7. Question
If The Joint Commission were to arrive during an active construction project, what action should the construction team take?
CorrectIncorrect -
Question 8 of 8
8. Question
When should the pre-construction risk assessment (PCRA) be completed?
CorrectIncorrect