Within healthcare facilities, what is the principle guideline of reference for HVAC systems?
In addition to ventilation and pressurization mitigation strategies, what additional controls must be assessed when completing an Infection Control Risk Assessment (ICRA 2.0)?
When reviewing construction drawings, where can you find the information needed to determine which doors are fire rated?
Within a 24-hour period, how long can the sprinkler system be impaired before you are required to initiate notification and fire watch?
Within a 24-hour period, how long can the fire alarm system be impaired before you are required to initiate notification and fire watch?
What is the primary difference between intumescent firestop sealant and elastomeric firestop sealant?
If The Joint Commission were to arrive during an active construction project, what action should the construction team take?
When should the pre-construction risk assessment (PCRA) be completed?