0 of 8 Questions completed
Questions:
You have already completed the assessment before. Hence you can not start it again.
Assessment is loading…
You must sign in or sign up to start the assessment.
You must first complete the following:
0 of 8 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
During a Joint Commission survey, which drawing type is requested and used during the survey process?
Which of the following building elements must be documented on life safety drawings?
Which of the following is designated on the life safety drawings?
Life safety drawings are building floor plans that identify life safety features as required by which National Fire Protection Association (NFPA) code?
According to National Fire Protection Association (NFPA) code, which of the following room types is not considered a suite?
Which of the following building infrastructure components is best defined as a continuous membrane, either vertical or horizontal, such as a wall, floor, or ceiling assembly that is designed and constructed to restrict the movement of smoke?
What is the purpose of a smoke barrier?
What information does the life safety drawing provide?
Test Test